Electrical Inspections

New Builds

Electrical inspections are required by the State of Iowa during the installation of a new electrical system and before it can be energized.

Once the new system has passed final inspection, a certificate will be issued by the State of Iowa. When CVEC receives the certificate, the meter will be installed and energized.

Temporary Disconnects

If the member-consumer requests temporary disconnection of service and it stays disconnected for 180 days or 6 months or longer, it will not be reconnected or energized until the installation passes an inspection conducted by the State of Iowa.

To apply for a permit or to find out more details about the State of Iowa electrical inspection program please click on the link below:
http://www.dps.state.ia.us/fm/electrician/ContactUs/Contact_Us.shtml

 

 